A-10 ADAM-5000
Quick Start Example
Figure A-3 Grounding the INIT* terminal
3. Wait at least 7 seconds to let self-calibration and ranging takeef-
fect.
4. Configure the baud rate and/or checksum status.
5. Switch the power to the ADAM-5000 system OFF.
6. Remove the grounding on the INIT* terminal and power the
ADAM-5000 system ON.
7. Wait at least 7 seconds to let self-calibration and ranging takeef-
fect.
8. Check the settings. (If the baud rate has changed, the settings on
the host computer should be changed accordingly)
-
+
DATA-
DATA+
COM
INIT*
GND
+Vs