Advantech MIC-5332 Manual de usuario Pagina 107

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 129
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 106
6.6.4 Payload Reset
In order to activate the new NVRAM image a payload reset is required.
The payload reset can be performed through different ways.
If the user is working on the OS via KCS a linux “reboot”,”poweroff” or “halt” will
activate the new NVRAM image.
If the user accesses the BMC through other interfaces (LAN/IPMB) a
deactivation and activation cycle is needed, in order to update the NVRAM.
(*) Component requires Payload Cold Reset
Vista de pagina 106
1 2 ... 102 103 104 105 106 107 108 109 110 111 112 ... 128 129

Comentarios a estos manuales

Sin comentarios