Advantech EKI-6322AG Manual de usuario Pagina 16

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 60
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 15
16
1.5. Outdoor Installation
Before installation, please read and follow the precautions to the installation:
1. Users MUST use a proper and well-installed surge protector in the outdoor installation.
Otherwise, lightening surge may damage the devices.
Lightning DAMAGE IS NOT COVERED UNDER WARRNTY.
2. Users MUST use the PoE Injector shipped in the box.
3. Users MUST power off the device first before connecting the external antenna to it.
Installation
Advantech EKI-6321AG can be mounted on the wall or an antenna mast as shown in the following
Step 1 Compose the holder of Advantech EKI-6321AG
Step 2 Connect the female end of the power cord into the PoE Injector, and then
connect the male end of the power cord into a power outlet. The red Power LED
at the front of the PoE Injector will be on.
Step 3 Connect RJ-45 Ethernet connector from Advantech EKI-6321AG into the
Power & Data Output Port on the PoE. When Advantech EKI-6321AG receives
power over Ethernet cable, Advantech EKI-6321AG will start its boot sequence
and the yellow Active LED at the front of the PoE will be on.
Vista de pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 59 60

Comentarios a estos manuales

Sin comentarios